Construction ListBits:Chongqing Yingtianhui Chlor-Alkali Chemical Co., Ltd.
Prepared by: Chongqing Ecological Environment Monitoring Center
IIOOneEight years in July.
|
Construction unit: |
Chongqing Yingtianhui Chlor-Alkali Chemical Co., Ltd. |
|
Legal Representative: |
LeeDryHua |
|
|
|
|
Prepared: |
Chongqing Ecological Environment Monitoring Center |
|
Center Director: |
To |
|
Deputy Director of the Center: |
Qin Fating |
|
Report prepared: |
Pan Ping |
|
Report Reviewer: |
Yu Jia Yan Tang Min |
|
Reviewer: |
Pan Guangwei |
|
Construction unit:Chongqing Yingtianhui Chlor-Alkali Chemical Co., Ltd. Company (Seal) |
|
Prepared by: Chongqing Ecological Environment MonitoringCenter Monitoring Center (Seal) |
|
Telephone:(023)40717030 |
|
Telephone:(023)88521222 |
|
Fax: |
|
Fax:(023)88521225 |
|
Zip Code: 401221 |
|
Zip Code:401147 |
|
Address: Chongqing(Longevity)Chemical Industry ParkNorth Huabei RoadNumber 2 |
|
Address: 252, Qishan Road, Ranjiaba, Yubei District, ChongqingNo. |
Chapter I Project Overview
Chongqing Yingtianhui Chlor-Alkali Chemical Co., Ltd. is a Sino-foreign joint venture jointly invested by Chongqing Jiangbei Chemical Fertilizer Co., Ltd., Chongqing Chengda Rubber Co., Ltd., and Hong Kong Yufengchuan Industrial Company. Enterprises in Chongqing (Changshou) Chemical Park need chlorine and alkali as basic raw materials, while Chongqing's chlor-alkali supply capacity is limited. To this end, Chongqing Yingtianhui Chlor-Alkali Chemical Co., Ltd. decided to seize this opportunity to build a 200000 t/a caustic soda project in the chemical park to reduce the risk of outsourcing liquid chlorine transportation by other enterprises in the park.
In March 2007, Chongqing Environmental Science Research Institute completed the "Environmental Impact Report of 200000 Tons/a Ion-exchange Membrane Caustic Soda Project of Chongqing Yingtianhui Chlor-Alkali Chemical Co., Ltd.". On April 3, 2007, Chongqing Environmental Protection Bureau approved the EIA report with Chongqing (City) Huanzhun [2007] No. 60 and agreed to the construction of the project in Chongqing (Changshou) Chemical Park.
In the process of project implementation, the project implementation plan is compared with the original EIA, and its production scale, product plan and main production process have not changed. However, the general layout has been greatly adjusted, and the volume and quantity of storage tanks and the corresponding risk prevention measures such as cofferdam and accident pool have changed to some extent. In October 2009, Chongqing Environmental Science Research Institute compiled and completed the "Environmental Impact Description of the Plane Layout Change of 200000 t/a Ion-exchange Membrane Caustic Soda Project of Chongqing Yingtianhui Chlor-Alkali Chemical Co., Ltd."
In April 2009, Chongqing Zhengda Environmental Protection Co., Ltd. completed the "Chongqing Yingtianhui Chlor-Alkali Chemical Co., Ltd. 200000 tons/year ion-exchange membrane caustic soda project environmental protection comprehensive treatment project design filing review data". On August 11, 2009, Chongqing Environmental Protection Bureau issued a review opinion on the design filing review materials with Chongqing (City) Environmental Equipment [2009] No. 024.
Project EIA and approved construction content: new 200000 tons/year ion membrane caustic soda plant and supporting devices. The project includes electrolysis process, primary brine process, brine treatment process, chlorine hydrogen and waste gas treatment process, hydrogen chloride synthesis and hydrochloric acid process.
Actual construction content of the project: Due to the phased construction of the project, 4 groups (100000 tons/year) of ionic membrane caustic soda and supporting devices have been completed in the first phase of the project, which passed the environmental protection acceptance of the project organized by Chongqing Environmental Protection Bureau on June 17, 2010, and was approved (Yu (City) Huan Yan [2010] No. 059). In the second phase of the project, two groups of ion membrane electrolyzers with 164 unit cells in each group will be built. At the same time, the micro-pole distance electrolyzers in the first phase will be upgraded technically. All of them will adopt the world's leading zero-pole distance electrolyzers and high-efficiency ion Asahi nitrate F8080A ion membrane, thus increasing the core parameter current density from the original 4.9KA/m2 to 6 KA/m2, and the whole device's design capacity of 200000 tons/year ion membrane caustic soda. At the same time, the material conveying pipeline and alarm device are added in the second stage, and the rest of the process and supporting devices are based on the existing devices.
The second phase of the project was started in May 2016 and completed in February 2017. On March 3, 2017, the Chongqing Municipal Environmental Protection Bureau issued a temporary pollutant discharge permit for the project, numbered "CQLJ[2017]015", and the project was put into trial operation. On July 26, 2017, the Environmental Protection Bureau of Changshou District, Chongqing City issued a pollutant discharge permit for the project, numbered "Yu (Chang) Huan Pai Zheng [2017] No. 0093".
According to the requirements of the Regulations on Environmental Protection Management of Construction Projects issued by Decree No. 253 of the State Council of the People's Republic of China, Chongqing Yingtianhui Chlor-Alkali Chemical Co., Ltd. entrusted Chongqing Ecological Environment Monitoring Center to carry out environmental protection acceptance monitoring and preparation of acceptance report for the 200000 t/a ion-exchange membrane caustic soda project of Chongqing Yingtianhui Chlor-Alkali Chemical Co., Ltd.
On May 26, 2017, our center organized professional and technical personnel to conduct site survey and data investigation. Based on the conclusions and acceptance technical specifications of the Environmental Impact Report of Chongqing Yingtianhui Chlor-Alkali Chemical Co., Ltd. Chlorine 200000 t/a Ionic Membrane Caustic Soda Project and the Environmental Impact Statement of Chongqing Yingtianhui Chlor-Alkali Chemical Co., Ltd. 200000 t/a Ionic Membrane Caustic Soda Project, the Implementation Plan for Environmental Protection Acceptance of Chongqing Yingtianhui Chlor-Alkali Chemical Co., Ltd. 200000
According to the acceptance implementation plan, Chongqing Ecological Environment Monitoring Center carried out on-site monitoring of the project from July 27 to 28, 2017. According to the information provided by the enterprise, on-site inspection, on-site monitoring results, acceptance technical specifications, environmental assessment report, approval and other relevant contents, the environmental protection acceptance report of the completion of the construction project was prepared.
The preparation of the report has received strong support from the Chongqing Environmental Protection Bureau and the close cooperation of Chongqing Yingtianhui Chlor-Alkali Chemical Co., Ltd., and I would like to express my sincere thanks.
Latest developments
2023-08-28
Yingtianhui Held Safety Production Summary Meeting in the First Half of the Year
On August 17, Yingtianhui held a summary of work safety in the first half of 2023 and a work plan meeting for the third quarter. Tian Shujing, Secretary of the Party committee, chairman of the board and director of the safety committee of the company, presided over the meeting. A total of 39 company leaders, members of the safety committee, professional leaders and safety management personnel attended the meeting.
2023-08-28
Yingtianhui Launches Middle-level Management Quality Improvement Class Training
In order to improve the leadership and execution of middle-level managers, strengthen communication and cooperation, and improve their overall quality, Yingtianhui carried out middle-level management quality improvement training in the form of special lectures or case analysis from July 21 to November 3 according to the training plan at the beginning of the year.
2023-08-28
Li Xingjian, member of the Standing Committee of Changshou District Committee and Minister of United Front Work Department of Chongqing Yingtianhui Chlor-Alkali Chemical Co., Ltd., led a team to Yingtianhui to carry out a cool and refreshing condolence activity.
On August 3, Li Xingjian, member of the standing Committee of the Changshou District CPC Committee and head of the United Front work Department, and Wei Beneng, deputy director of the United Front work Department of the District CPC Committee and secretary of the party group of the Federation of Industry and Commerce, led a team to Yingtianhui to carry out a high-temperature condolence activity with the theme of "sending coolness in summer and reaching the front line of true feelings. Ying Tianhui deputy general manager Xiao Min accompanied the condolences.
2023-07-27
Yingtianhui organized the safety knowledge competition of "everyone talks about safety, everyone will respond to emergencies"
In order to thoroughly publicize and implement the spirit of the 20th CPC National Congress and General Secretary Xi Jinping's important exposition on production safety, comprehensively promote production safety publicity and education, enhance the self-protection awareness and emergency rescue ability of the broad masses of workers, and lay a solid foundation for the company's production safety. On June 27, Yingtianhui organized a safety knowledge competition of "everyone talks about safety, everyone will respond to emergencies.
2023-07-27
Yingtianhui Successfully Held the Art Party of "Practicing New Ideas, Showing New Ideas and Striving for New Journey"
In order to solemnly celebrate the 102 anniversary of the founding of the Communist Party of China and carry forward the great party building spirit, Yingtianhui held a theatrical performance with the theme of "Practicing New Ideas and Showing New as a New Journey" on the evening of June 27.
渝公網(wǎng)安備50011502000450號